Galiano BOV Hearing Minutes
· Galiano Island · Meeting Documents · 2025
Original Trust document
· 118 KB
· SHA-256 59d99f7b953ed816…
5,825 characters of machine-extracted text. Extraction is automatic and can be wrong; the original governs.
Topics: First Nations & reconciliation — our classification, not the Trust's.
Extracted text (beginning)
Galiano Board of Variance Minutes of a Hearing February 18, 2025 ADOPTED 1 of 3 Galiano Island Board of Variance Minutes of a Hearing Members Present: Bert Hol, BOV Chair Priscilla Ewbank, BOV Member Dennis Perch, BOV Member Staff Present: Kim Stockdill, Island Planner Bruce Belcher, Planner 2 Carly Bilney, Recorder Applicants: Michael Carrothers Others Present: Brent Dennis Erin Willows There were no members of the public present. 1. CALL TO ORDER Island Planner Stockdill called the meeting to order at 12:36 p.m. She acknowledged that the meeting was being held on the territories of the Coast Salish Peoples. 2. APPROVAL OF AGENDA By general consent the agenda was approved as presented. 3. SELECTION OF BOARD OF VARIANCE CHAIR GL-BOV-2025-01 It was Moved and Seconded, that Galiano Island Board of Variance appoint Bert Hol as the Galiano Island Board of Variance Chair. CARRIED 4. MINUTES 4.1 Galiano Island Board of Variance Minutes Dated August 19, 2021 By general consent the Galiano Island Board of Variance meeting minutes of August 19, 2021 were adopted. Date: Location: February 18, 2025 Electronic Meeting A D O P T E D Galiano Board of Variance Minutes of a Hearing February 18, 2025 ADOPTED 2 of 3 Support was expressed for having the Board of Variance review the completed meetings minutes soon after the meeting, rather than at the next Board of Variance meeting so the discussion is still fresh in Board members’ memories. 5. APPLICATIONS 5.1 PL-BOV-2024-0273 (Carrothers) - Staff Report Island Planner Stockdill reviewed the staff report. The following comments were made: • The variance would allow for the replacement of the old septic dispersal field by a modern one in the same location • The property is in an archaeologically important area and the property owner is working with the existing design to reduce the risk of unnecessary disturbance to the site • Archaeologist Erin Willows visited the site in 2021; her assessment supports using as much of the existing infrastructure as possible • The property owner has been mindful and respectful of reducing or eliminating ground disturbance • An updated septic dispersal field would reduce the chances of effluent entering the ocean • The proposed retaining wall would be a 4.5-foot stone wall that holds soil in around the septic tanks • The tanks are made of polyethylene and the soil would protect them from UV light; a soil berm would also alleviate concerns about earthquake stability • First Nations have had opportunity during the archaeological referral period to comment on the proposed work, and the plan has received support so far; First Nations may provide oversight when the work is being done if they are available • Wastewater control is important; the septic field system has been in use for decades and no evidence of breakout onto the beach could be found; in modern systems
First 3,000 characters. Open the original for the whole document.