Gambier Island Local Trust Committee
Special Meeting Addendum
Date:September 20, 2017
Time:7:00 pm
Location:John Braithwaite Community Centre
145 West 1st Street
North Vancouver, BC
Pages
5.BUSINESS ITEMS7:10 PM - 8:35 PM
5.1GM-RZ-2004.1 (District Lot 696, Keats Island) - Staff Report
5.1.1Supplemental Memorandum Hydrogeological Study dated September
12, 2017
2 - 7
5.1.2Supplemental Memorandum #2 Hydrogeological Study dated
September 15, 2017
8 - 12
1
IslandsTrust
275 – 3001 Wayburne Drive
Burnaby, BC V5G 4W3 Canada
T: 604.874.1245 • www.exp.com
Page 1 of 3
ISO
9001:2008
REGISTERED
Memorandum
Date:
September 12, 2017
Reference No.: VAN-00240303-A0
To:
Sonja Zupanec, RPP
Island Planner, Islands Trust
szupanec@islandstrust.bc.ca
Total No. of Pages: 3 + Attachments
From:
Matthew D. Munn, P.Eng. matthew.munn@exp.com
Jeff Johnson, BA, MBA jeff.johnson@exp.com
Project: Hydrogeological Study (Phase 1) – Supplementary Information
DL696, Keats Island, BC
1 INTRODUCTION
Exp Services Inc. (exp) was retained by the Convention of Baptist Churches of BC (the Convention) to
complete a “Preliminary Hydrogeological Assessment” requested by Islands Trust for an on-going rezoning
application for the Convention’s above-referenced property on Keats Island, BC. Accordingly, exp prepared
a “Hydrogeological Study - Phase 1” report and submitted it to Islands Trust on July 25, 2017. The primary
objective of exp’s Phase 1 Study was to complete a preliminary review and assessment of available
property information and provide rezoning-stage confirmation that potable water needs for the Convention’s
proposed lots and intended uses could be satisfied from on-site groundwater sources and that neither the
proposed groundwater extractions nor proposed community sewerage systems would have adverse
impacts on local groundwater resources, groundwater users, and receiving waters. The Phase 1 Study
was completed in agreement with exp’s Work Plan delivered to the Convention on May 17, 2017.
Aspects of the Phase 1 Study were discussed during a September 8, 2017 teleconference meeting attended
by Islands Trust staff, Mr. Kevin Healy of CREUS Engineering Ltd. (CREUS) and Mr. Matthew Munn of
exp. Based on feedback and comments provide by the Islands Trust attendees, this memorandum has
been prepared to provide supplementary information as additional context for the Gambier Local Trust
Committee’s consideration of the Phase 1 Study report.
This memorandum and attached Table 1 Concordance Summary has been prepared by exp in consultation
with CREUS. Use of this memorandum must include consideration of the Section 3 Limitations and the
attached “Interpretation & Use of Study and Report” (Attachment #1).
2 SUPPLEMENTARY INFORMATION
2.1 Phase 1 Hydrogeological Study Scope
Scope for exp’s Phase 1 (i.e., rezoning stag