Executive Committee Acting as a Local Trust Committee (Ballenas-Winchelsea) Regular Meeting Minutes
· Ballenas-Winchelsea · Meeting Documents · 2024
6,308 characters of machine-extracted text. Extraction is automatic and can be wrong; the original governs.
Topics: First Nations & reconciliation · Governance & budget · Marine & foreshore — our classification, not the Trust's.
Extracted text (beginning)
--- OCR PAGE 1: https://islandstrust.bc.ca/document/ballenas-winchelsea-regular-meeting-minutes/ --- ADOPTED Islands Trust Executive Committee Acting as a Local Trust Committee (Ballenas-Winchelsea Islands) Regular Meeting Agenda Date: June 18, 2024 Location: Harbour House Hotel 121 Upper Ganges Road, Salt Spring Island, BC Members Present: Peter Luckham, Chair Tobi Elliott, Trustee David Maude, Trustee Timothy Peterson, Trustee Staff Present: Chris Hutton, Regional Planning Manager Bruce Belcher, Planner 1 Rob Pingle, Legislative Clerk Lisa Millard, Recorder (electronic) Others Present: There were no members of the public in attendance. 1. CALL TO ORDER Chair Luckham called the meeting to order at 9:05 a.m. He acknowledged that the meeting was held on the territory of the Coast Salish First Nations. 2. APPROVAL OF AGENDA By general consent, the agenda was approved as presented. 3. PUBLIC COMMENTS - None 4. MINUTES 4.1 Local Trust Committee Minutes dated October 4, 2023 - for adoption By general consent, the Local Trust committee meeting minutes of October 4, 2023 were adopted. 4.2 Resolutions Without Meeting Report dated June 2024 Received for information. 5. BUSINESS ARISING FROM MINUTES 5.1 Follow-up Action List Report dated June 2024 Received for information. 6. COMMUNITY INFORMATION MEETING – None Ballenas - Winchelsea Executive Committee Acting as Local Trust Committee Minutes June 18, 2024 ADOPTED 1 --- OCR PAGE 2: https://islandstrust.bc.ca/document/ballenas-winchelsea-regular-meeting-minutes/ --- ADOPTED 7. PUBLIE HEARINGS - None 8. APPLICATIONS AND REFERRALS 8.1 EX-DP-2024.1 (C. Walker) – Staff Report The Planner summarized the staff report and highlighted the following: • The development permit application is for the new construction of a single family dwelling located within the shoreline development permit area; • Any construction on Mistaken Island would fall within the 30 metre buffer from the natural boundary to the sea; • The building site was chosen to be located within an area that had previously been disturbed; • Tree removal will be limited to three trees considered dangerous; • The applicant has proposed to relocate the existing cabin and build a new structure 2.5 metres further from the natural boundary of sea than the existing building location; • The application is based on professional biologist and professional geological engineer assessments; and • The application meets all of the objectives and guidelines for the development permit area. The applicant was in attendance and noted the following: • They actively protect the ecosystem on the island; • They are focussed on building within the area of previously disturbed land and maintaining a small footprint; • They will be bringing a small excavator on site but no heavy equipment; and • They are building a net zero energy home. Trustee Peterson stated that the island is located within the Snaw-Naw-As First Nation whom Islands Trust will be s
First 3,000 characters. Open the original for the whole document.